3.1.4 Minimum Straight Run Requirements
The straight run requirements presented below represent the minimum requirements
for accurate ow measurement. For optimum performance, provide as much additional
straight run as possible.
IMPORTANT NOTE
For proper operation, install the ow meter in a straight run of pipe free of bends, tees, valves,
transitions and obstructions for a distance of at least 3 diameters upstream and 2 diameters
downstream.
Recommended Installation
Place ow meter at least 3
pipe diameters upstream
and 2 pipe diameters
downstream from bends
and obstrutions.
Avoid downward ow
which can lead to partially
lled pipes.
The electrodes should
be located in the
horizontal axis (3 o’clock
and 9 o’clock) in order to
prevent sediment from
settling on them.
Avoid these installations
Electrode Location